INSTALLATION

2000 Autoflow

Drying Chamber Overflow Rotary Switch Installation

1)Drill a 2” diameter hole through the roof panel at the location shown in figure 8.

See Component placement ` on page 9 for proper place- ment in relation to fill auger.

2)Use the mounting plate as a pattern and drill four 3/8” holes through the roof panel at the switch location so the plate can be bolted to the roof.

3)Attach the flex coupling to the rotary switch power pack using a roll pin.

4)Apply teflon tape or pipe sealant (not

included) to the rotary switch power pak threads and thread the rotary switch power pack into the mounting plate coupling.

5)Make sure that the conduit hole is at right angles with the roof panel ribs or facing towards the eave.

6)Caulk the underside of the mounting plate and on all sides of the 2” hole.

7)Bolt the assembly to the roof panel.

8)Attach the 3-vane paddle to the flex coupling as shown in figure 11.

Figure 8

30

Page 30
Image 30
GSI Outdoors 2TFC, 2TAF installation instructions Drying Chamber Overflow Rotary Switch Installation