GSI Outdoors 2TAF, 2TFC Autoflow to Actuator Interconnect, Electrical Power Supply

Models: 2TF 2TAF 2TFC

1 57
Download 57 pages 2.26 Kb
Page 43
Image 43
Autoflow to Actuator Interconnect

2000 Autoflow

ELECTRICAL POWER SUPPLY

Autoflow to Actuator Interconnect

The Actuator Control Box houses the 24V DC linear actuator, two (2) 12V DC Batteries, and a 24V DC battery charger. The linear actuator raises and lowers the dump chutes to unload grain automatically from the drying chamber to the storage chamber. The two (2) 12V DC batteries act as a backup to prevent wet grain from dumping into the storage chamber during a power outage. The 24V DC battery charger provides a continuous recharge to the batteries.

To wire the Actuator Control Box to the Autoflow Control Box do the following.

1)Run five (5) control wires from the Autoflow Control Box to the Actuator Control Box.

2)Run three (3) power wires from the Entrance Panel to the Actuator Control Box.

3)Connect the wires as shown in figure 20.

Figure 20

43

Page 43
Image 43
GSI Outdoors 2TAF, 2TFC installation instructions Autoflow to Actuator Interconnect, Electrical Power Supply