Dump Chute Cable Installation

2000 Autoflow

ELECTRICAL POWER SUPPLY

Dump Chute Cable Installation

After complete installation of the Autoflow Unit the cable should be hooked up to the linear actuator in the Actuator Control Box. To test the linear actuator and install the cable do the following:

1)Turn all switches on the Autoflow control front panel to the “off” position.

2)Make sure the Emergency Stop switches on all the control boxes are pulled out.

3)Turn the Control Power switch to the “on” position.

4)The display should read “stopped” at the bottom.

5)While watching the linear actuator turn the Dump switch to the “manual open” position.

6)The Linear actuator should extend down 16”.

7)Place the Dump switch in the “auto” position and press the Stop switch.

8)The linear actuator should retract and stop.

9)Place the Control Power switch in the “off” position and push the Emergency stop switch in on the Autoflow and Actuator Control Boxes.

10)Route the cable as shown in figure 29.

11)Make sure that all dump chutes are approximately 5 degrees below level when in the closed position.

12)Double check all dump chutes to make sure that they are all adjusted the same when in the closed position. The Autoflow Unit will not operate properly if the dump chutes are adjusted unevenly.