GSI Outdoors 2TFC, 2TAF Installation, 5Make sure that the conduit hole is at

Models: 2TF 2TAF 2TFC

1 57
Download 57 pages 2.26 Kb
Page 26
Image 26
5)Make sure that the conduit hole is at

INSTALLATION

2000 Autoflow

Drying Chamber Low-Level Rotary Switch Installation

1)Drill a 2” diameter hole through the roof panel at the location shown in figure 8.

See component placement on page 9 for proper placement in relation to fill auger.

2)Use the mounting plate as a pattern and drill four 3/8” holes through the roof panel at the switch location so the plate can be bolted to the roof.

3)Attach the flex coupling to the rotary switch power pack using a roll pin.

4)Apply teflon tape or pipe sealant (not included) to the rotary switch power pak threads and thread the rotary switch power pack into the mounting plate coupling.

5)Make sure that the conduit hole is at

right angles with the roof panel ribs or facing towards the eave.

6)Caulk the underside of the mounting plate and on all sides of the 2” hole.

7)Bolt the assembly to the roof panel.

8)Attach the shaft extension according to figure 9.

9)Apply teflon tape or pipe sealant (not included) to the shaft guard.

10)Thread to underneath side of mounting plate.

11)Add the 1/4” drilled coupling to the shaft extension using the cotter pin.

12)Attach the 1-vane paddle to the flex coupling as shown in figure 9.

Figure 8

26

Page 26
Image 26
GSI Outdoors 2TFC, 2TAF installation instructions Installation, 5Make sure that the conduit hole is at