Section 6
DIAGNOSTIC TESTS
TEST 31 - Remove Wire 18 / Shutdown
Lead
PROCEDURE:
leads across TEST POINTS B INFINITY should be measured. Connect meter test leads across TEST POINTS C. INFINITY should be measured (See Figure
1.Disconnect Wire 18 from the Stud located above the oil cooler that extends out From the shrouding.
2.Perform Test 29 again checking for Spark.
RESULTS:
Refer back to Flow Chart.
WIRE 18
SHUTDOWN
LEAD
Figure 6-40. – Wire 18
6.Remove Wire 229 from the SSR. Connect a jumper lead from the terminal of the SSR that Wire 229 was just removed from and to frame ground. The relay should energize closed. Set a voltmeter to measure resistance. Connect meter test leads across TEST POINTS A INFINITY should be measured. Connect meter test leads across TEST POINTS B continuity/ closed should be measured. Connect meter test leads across TEST POINTS C continuity/closed should be measured. See Figure 6.43. If the SSR fails any test replace it.
RESULTS:
Refer to Flow Chart.
1418
| 1 |
| 2 | 4 | 15B |
15 | 5 |
| 6 | 8 | |
|
| ||||
|
|
| |||
| 9 |
| 10 | 12 |
|
15 |
| 13 |
| 14 | 0 |
| SSR |
|
TEST 32 - TEST START STOP RELAY (SSR)
PROCEDURE:
15
229
1. | Set a voltmeter to measure DC voltage. |
2. | Remove Wire 15 from Terminal 13 on the Start Stop Relay |
| (SSR). Connect the positive meter test lead to Wire 15 previ- |
| ously removed. Connect the negative meter test lead to frame |
| ground. 12 VDC should be measured, if it is proceed to Step 3. |
| If 12 VDC is not measured repair or replace Wire 15 between |
| the SSR and the Battery Charge Rectifier 2 (BCR2). |
3. | With Wire 15 reconnected to the SSR remove Wire 229 from |
| the SSR. Connect a jumper lead from the terminal of the SSR |
| that Wire 229 was just removed from and to frame ground. See |
| Figure |
| it to see if it closes. If the relay energizes closed proceed to |
| Step 4. If the relay does not energize closed replace it. |
4. | Remove Wire 0, Wire 18, Wire 15, Wire 15B, Wire 15, and Wire |
Figure 6-41. – Start Stop Relay (SSR)
| 14 | TEST POINTS C |
| 18 | ||
|
| TEST POINTS B |
| |||
|
|
|
| |||
|
|
|
| TEST POINTS A |
| |
|
| 1 |
| 2 | 4 | 15B |
15 |
| 5 |
| 6 | 8 | |
|
|
| ||||
|
|
|
| |||
|
| 9 |
| 10 | 12 |
|
15 |
|
| 13 | SSR 14 |
| 0 |
|
|
|
|
14. See Figure |
5. Set a voltmeter to measure resistance. Remove jumper lead |
from Step 3. Connect meter test leads across TEST POINTS |
15
229
A continuity/closed should be measured. Connect meter test |
Figure 6-42. – Start Stop Relay (SSR) Not Energized
Page 54