Haier 0010571570, AB212BCBAA Installation procedure, Install indoor unit, Original cement panel

Models: 0010571570 AB212BCBAA

1 38
Download 38 pages 54.68 Kb
Page 27
Image 27
Original cement panel

Installation procedure

Install indoor unit

Original cement panel

Use the in hole hinge, in hole plug or in hole screw.

Steel structure

Directly use angle steel or new angle steel for support.

Suspending of indoor unit

Suspending bolt

Hoisting screw

Angle steel for support

Adjust the position of screw cap (underside) to make the gap between the attached washer (underside) and the ceiling is 135mm.

*.Installation of indoor unit

M10 screw

Manual background135mm

Ceiling

Hoisting screw

Screw cap (upside)

Attached washer

(The suspending part of the unit)

Screw cap (underside)

Manual background Tighten the screw cap of the hoisting screw and suspend them on the T groove of the unit suspending part.

Manual background Use gradienter to keep the level degree of the unit within 5mm.

Manual background Use installation paper panel to confirm and adjust the position relation between unit and ceiling opening and the suspending height of the unit. (shows the using direction of the installation paper panel)

*The bottom of indoor unit is 43mm away from the bottom of ceiling. (4 corners)

*The side of the indoor unit leaves 25mm gaps from ceiling.

4 edges together

The fittings should be prepared on site except for M10 flat washer

Gradienter

Suspending bolt (M8 or M10)

Screw cap (M8 or M10)

M10 or M8 flat washer

Hoisting screw

Suspending pole

M10 or M8 flat washer

In order to prevent the bolt from breaking off (safety), they must be installed blow the sus pending parts as this figure shown.

Screw cap (M8 or M10)

Indoor unit

43mm

 

Ceiling

Installation paper panel 25mm

 