Haier AB212BCBAA, 0010571570 manual Connection of pipe, Installation procedure

Models: 0010571570 AB212BCBAA

1 38
Download 38 pages 54.68 Kb
Page 36
Image 36
Connection of pipe

Installation procedure

Connection of pipe

1. Connection of pipe**

Manual background For the specific max length and the max fall of connection pipe, please refer to the manual of outdoor unit.

Manual background In order to guarantee the efficiency, the pipe should be as short as possible.

Manual background Daub the refrigerant oil on the joint and the flared nut.

Manual background When bending the pipes, give the roundness as large as possible, to avoid crashing the pipes. Manual background To connect the pipe, fit the center and use hand to screw the nut, then use spanner to tighten the nut, as shown in figure.

Manual background Pay attention not to let alien matters, such as sand, vapor get into the pipe.

Manual background The connection of indoor unit pipe must be performed by using two spanners.

2. Dimension of connection pipe

Joint Nut

Spanner

Manual background Spanner

If do not fit the center and screw the nut hard, the screw thread may be damaged, which will cause refrigerant leakage.

Pipe diameter

Fasten torque

Liquid pipe

9.52mm

32.7~39.9 N.m

Gas pipe

15.88mm

61.8~74.5 N.m

3. The additional charging amount of refrigerant

The additional charging of refrigerant (R407C) should be complied with the installation manual of outdoor unit. It must use measurer to quantificationally charge. The additional charging amount must be complied with the specified amount.

Requirements: Both excessive charging and less charging of refrigerant will cause the compressor trouble. It must be complied with the specified amount.

4.Discharging of pipe

**For details, please refer to the pipe installation part in the manual of outdoor unit.

5.Leakage detection

Manual background Use leakage detector or soap water to check if the connected part of the connection pipe and the valve cap leak.

6.Thermal insulation treatment

Manual background The thermal insulation of connection pipe should be performed at both gas side and liquid side. In COOLING, both liquid side and gas side are in low temperature, in order to prevent dew from forming, thermal insulation should be done.

Manual background The thermal insulation material at the gas side must use the material with the heat resistant temperature over 120*.

Manual background The connected parts of indoor unit connection pipe should be thermal insulated.

34

Page 36
Image 36
Haier AB212BCBAA, 0010571570 manual Connection of pipe, Installation procedure