Installation procedure
Install indoor unit
Test of drainage system
(a)After finishing the electric work, perform the test to the drainage system.
(b)During test, confirm the water flow properly passes the hose and there is no leakage at the joint.
(c)If the house is new, perform test before installing ceiling.
(d)Even if installing in the season needing to make heating, the test also must be performed.
Procedure
(a)Through the air outlet and use water pump to provide the equipment with about 1000cc water.
(b)In COOLING operation, check the drainage system.
Maintenance cover
Drain hose The drainage |
| |
outlet for maintenance |
| |
(with a rubber stop) | Checking hole | |
(use this outlet to discharge | ||
| ||
the water in the drain pan) |
|
100mm |
| (Charge through the checking hole) | |
|
|
| |
|
|
|
|
Plastic watering pot | (discharge through the | ||
(the pipe should be | |||
about 100mm long) | air discharging hole) |
Connected with outdoor unit
Terminals block of the power
The PC board of the indoor unit
Terminals block of the power
Electric box cover
7.Electric circuit
All the provided parts, material and electric work should be complied with the local regulation.
Must use cooper core cable.
When performing electric work, please refer to the wiring diagram on the unit.
All the wiring work should be done by the qualified electrician.
A breaker which can cut off the power of the whole circuit must be equipped.
For the specification of the power cable connected with the outdoor unit, the capacity of breaker and switch and the guide of circuit, etc. please refer to the configuration of the power supply.