Minimum Clearances from the Vent Pipe to

Combustible Materials

For Horizontal Sections

For Vertical

At Wall Firestops

Sections

 

 

 

 

 

 

 

 

Top

Bottom

Sides

 

 

Top

Bottom

Sides

 

 

 

 

 

 

 

 

3 inches

1 inch

1 inch

1 inch

2-1/2 inches

1/2 inch

1 inch

(75 mm)

(25 mm)

(25 mm)

(25 mm)

(63.7 mm)

(13 mm)

(25 mm)

 

 

 

 

 

 

 

 

Step 2

Framing the

Fireplace

For minimum clearances, see the direct vent termination clearance diagrams on pages 21 and 22 in this section.

Fireplace framing can be built before or after the fireplace is set in place. Framing should be positioned to accommodate wall coverings and fireplace facing material. The diagram below shows framing reference dimensions.

CAUTION

MEASURE FIREPLACE DIMENSIONS AND

 

VERIFY FRAMING METHODS AND WALL

 

COVERING DETAILS BEFORE FRAMING

 

CONSTRUCTION BEGINS.

46 3/4 (REF)

B

D

Shows center of 10” x 10” vent framing holes for top venting.

Framing should be constructed of 2 X 4 lumber or heavier.

A

C

A

B

C

D

35 1/2”

43 5/8”

19 5/8”

47 3/4”

(902mm)

(1108mm)

(498mm)

(1213mm)

 

 

 

 

Figure 3. Framing Dimensions

12

Heat & Glo • CFX-CRESCENT705-900 Rev. P • 12/07

Page 12
Image 12
Hearth and Home Technologies CFX-Crescent owner manual Step Framing Fireplace, Framing Dimensions