Space$aver ™
Installation
3.With a forklift, place the top unit on the provided pins over the other unit.
NOTICE
Support the unit to prevent it from tipping.
4.Remove the back panel of the top unit.
5.Connect the power cable (see Chapter “Connecting the power supply”, Page 23).
6.Install the hose retainer and ventilation plate with the back panel of the top unit.
7.Push the extension for the air outlet hose from above through the hose retainer into the air outlet hose.
8.Fully connect both units (see Chapter “Connecting the power supply”, Page 23 and Chapter “Water supply”, Page 28).
9.Connect the waste water connections separately for both units (see Chapter “Waste water connection”, Page 32).
Planning and installation instructions | 21 |
Global Foodservice Solutions