Space$aver ™
Water
Figure 6: Position of the
1
2
3
Figure 7: Parts of the
1Sealing ring
2Threaded connector
3Metal ring
1.Check that both sealing rings (1) are lying flat in the threaded connectors (2).
2.Screw the threaded connectors (2) evenly onto the hard and soft water connections and tighten securely. Avoid
Planning and installation instructions | 31 |
Global Foodservice Solutions