Hobart Welding Products 210 MVP manual Installing Work Clamp

Models: 210 MVP

1 56
Download 56 pages 53.5 Kb
Page 20
Image 20

5-3. Installing Work Clamp

.Connection hardware must be tightened with proper tools. Do not just

hand tighten hardware. A loose electrical connection will cause poor weld performance and excessive heating of the work clamp.

1Nut

2Work Cable From Unit

3Work Clamp

4Screw

5Work Clamp Tabs

Bend tabs around work cable.

6 Insulating Sleeves

Slide one insulating sleeve over work cable before connecting to clamp.

Slide insulating sleeves over handles.

1

6

2

3

5

4

Tools Needed:

7/16 in.

7/16 in.

802 456-A

OM-249 498 Page 16

Page 20
Image 20
Hobart Welding Products 210 MVP manual Installing Work Clamp