25 | Commissioning |
|
|
|
|
6.Select the battery
ENTER when finished.
Display | Description | Optimal |
ENTER BATTERY AHr 100 | Set the battery | Enter 140 for 100Ahr |
| for ONE battery | batteries |
7.Select the number of battery banks in parallel by using the arrow keys. Press ENTER when finished.
Display | Description | Optimal |
ENTER BATTERY BANKS 1 | Set the number of battery banks | Enter 3 for one bank of |
|
|
8.At this point the batteries are all set up. Now you will proceed to setting up the turbine and checking its components for operation. Turbine setup requires two people: one located at the turbine and one located at the system Smart Box.
9.Step 10 is for testing the turbine. Turn on the turbine disconnect.
10.If the wind is not causing the turbine wheel to spin, gently spin the wheel by hand to determine if the system Smart Box is detecting a voltage level.
Display | Description |
TURBINE INPUT OK | Shows if a turbine voltage was found. |
|
|
11.Step 12 is for testing the AC grid connection. Turn on the AC disconnect from the grid input.
12.Check the LCD screen and make sure the AC voltage is OK. Press ENTER to continue.
Display | Description |
| Checks the AC voltage. Press ENTER |
AC Grid 120V OK?? | to skip this step if this is a |
| connection. |
13.Step 14 is for testing the AC load connection.Turn on the AC disconnect to the load. Turn on all items on the sub panel load to make sure that the turbine inverter can handle the load.
14.The system commission process is now complete. Press ENTER to start the turbine. If required, this process can be restarted via the technician’s menu.
Display | Description |
COMMISSION COMPLETE | Press ENTER to start the turbine. |
|
|