25

Commissioning

 

 

 

 

6.Select the battery Amp-hour rating for ONE battery by using the arrow keys. Press

ENTER when finished.

Display

Description

Optimal

ENTER BATTERY AHr 100

Set the battery amp-hour rating

Enter 140 for 100Ahr

 

for ONE battery

batteries

7.Select the number of battery banks in parallel by using the arrow keys. Press ENTER when finished.

Display

Description

Optimal

ENTER BATTERY BANKS 1

Set the number of battery banks

Enter 3 for one bank of

 

 

2-12V batteries

8.At this point the batteries are all set up. Now you will proceed to setting up the turbine and checking its components for operation. Turbine setup requires two people: one located at the turbine and one located at the system Smart Box.

9.Step 10 is for testing the turbine. Turn on the turbine disconnect.

10.If the wind is not causing the turbine wheel to spin, gently spin the wheel by hand to determine if the system Smart Box is detecting a voltage level.

Display

Description

TURBINE INPUT OK

Shows if a turbine voltage was found.

 

 

11.Step 12 is for testing the AC grid connection. Turn on the AC disconnect from the grid input.

12.Check the LCD screen and make sure the AC voltage is OK. Press ENTER to continue.

Display

Description

 

Checks the AC voltage. Press ENTER

AC Grid 120V OK??

to skip this step if this is a non-grid-tie

 

connection.

13.Step 14 is for testing the AC load connection.Turn on the AC disconnect to the load. Turn on all items on the sub panel load to make sure that the turbine inverter can handle the load.

14.The system commission process is now complete. Press ENTER to start the turbine. If required, this process can be restarted via the technician’s menu.

Display

Description

COMMISSION COMPLETE

Press ENTER to start the turbine.

 

 

SMARTBOX™ Controller for HONEYWELL™ Wind Turbine WT6500 Owner’s Manual - Rev14

Page 32
Image 32
Honeywell WT6500 owner manual Shows if a turbine voltage was found, Press Enter to start the turbine