8)Connect the hose to the water valve and secure it with the clamp.

9)Pour water into the reservoir, and check for water leaks.

10)Open the water supply line shut-off valve.

11)Plug the unit back in.

12)Move the flush switch to the "ICE" position.

13)Check for water leaks.

14)Move the flush switch to the "FLUSH" position, and make sure water is flushing.

15)Move the flush switch to the "ICE" position.

16)Replace the panels in their correct positions.

17)Plug the unit back in.

44

Page 44
Image 44
Hoshizaki F-300BAF service manual