12.Disconnect the threaded
13.Remove the threaded
To replace this component, see "Replacing the flow meter (on page 117)."
Replacing the flow meter
NOTE: This procedure is specifically for the replacement of the Type 2 flow meter.
NOTE: The Type 2 flow meter should arrive with the
1.Insert the two fiber gaskets on either side of the flow meter.
IMPORTANT: Be sure the arrow on the flow meter is pointing toward the rear of the MCS unit to ensure proper water flow.
2.Insert the flow meter back into place on the water line.
3.Using the
4.Route the flow meter
5.Connect the flow meter
6.Replace the AC transfer switch ("Replacing the AC transfer switch" on page 28).
7.Replace the magnetic solenoid valve ("Replacing the magnetic solenoid valve" on page 84).
8.Replace the bottom heat exchanger unit ("Replacing the heat exchanger unit with couplers" on page 63).