Installing the Switch
Installation Procedures
5. Verify the Switch Passes Self Test
Before mounting the switch in its network location, you should first verify it is working properly by plugging it into a power source and verifying it passes self test.
1.Connect the power cord supplied with the switch to the power connector on the back of the switch, and then into a properly grounded electrical outlet.
Switch the Installing
| Figure |
|
|
N o t e | The 3500, 3500yl and 6200yl switches do not have a power switch. They are |
| powered on when the power cord is connected to the switch and to a power |
| source. For safety, the power outlet should be located near the switch |
| installation. |
| The switch automatically adjusts to any voltage between |
| volts and either 50 or 60 Hz. No voltage range settings are required. |
| If your installation requires a different power cord than the one supplied with |
| the switch, be sure to use a power cord displaying the mark of the safety |
| agency that defines the regulations for power cords in your country. The mark |
| is your assurance that the power cord can be used safely with the switch. |
|
|