Installing the Switch
Installation Procedures
■Installation Location - Before installing the switch, plan its location and orientation relative to other devices and equipment:
•In the front of the switch, leave at least 7.6 cm (3 inches) of space for the
•In the back of the switch, leave at least 10.16 cm (4 inches) of space for the cl module cabling.
•On the sides of the switch, leave at least 7.6 cm (3 inches) for cooling, except if the switch is installed in an open EIA/TIA rack.
Installing the Switch