Installing the Switch

Installation Procedures

4. Verify the Switch Passes Self Test

Before mounting the switch in its network location, you should first verify it is working properly by plugging it into a power source and verifying it passes self test.

1.Connect the power cord supplied with the switch to the power connector on the back of the switch, and then into a properly grounded electrical outlet.

Switch the Installing

 

 

Connect power cord

 

 

 

to the power

 

 

 

connector

 

 

 

 

 

N o t e

The Series 6400cl Switch devices do not have a power switch. They are

 

powered on when the power cord is connected to the switch and to a power

 

source. For safety, the power outlet should be located near the switch

 

installation.

 

The switch automatically adjusts to any voltage between 100-240 volts and

 

either 50 or 60 Hz. No voltage range settings are required.

 

If your installation requires a different power cord than the one supplied with

 

the switch, be sure to use a power cord displaying the mark of the safety

 

agency that defines the regulations for power cords in your country. The mark

 

is your assurance that the power cord can be used safely with the switch.

 

 

 

 

2-9