Installing the Switch

Installing the Switch

Installation Procedures

 

3. (Optional) Install or Remove a Transceiver

 

 

W A R N I N G

The ProCurve X2 fiber optic transceivers are Class 1 or Class 1M laser

 

devices. Avoid direct eye exposure to the beam coming from the

 

transmit port.

 

a. Slide the transceiver in until it stops.1

 

1If you are installing either of the Series 6400cl Switch devices using a fiber transceiver, the operating ambient temperature should not exceed 40°C (104°F). See transceiver specifications in the ProCurve Switch cl Modules Installation Guide.

b.Push firmly until the gasket seats against the bulkhead.

Bail

N o t e
When switch power is on, the Link and Activity LEDs will come on for

 

approximately two seconds and then go off. This is confirmation the

 

transceiver is installed and seated correctly.

 

c. If your transceiver has a bail, move the bail up, if not your transceiver is

 

 

now completely installed. Refer to the ProCurve Switch cl Module

 

Installation Guide for more details.
To remove the transceiver:

If your transceiver has a bail, lower the bail until it is approximately horizontal, and then using the bail, pull the transceiver from the slot. If your transceiver does not have a bail, pull the transceiver straight out.

2-8