
6
CAUTION
HP 8517B Test Set Replacement Procedures
The replacement procedures in this chapter are listed below:
1“A18 Switch/Splitter Assembly” on page
2“A14, A10 to A13 Frequency Converter Assembly” on page
3“A15 Regulator Board Assembly” on page
4“C1 to C4 Filter Capacitors” on page
5“2.4 mm Test Port Connectors” on page
6“Fan Assembly Replacement” on page
7“T1 Power Transformer” on page
8
9“A1 Front Panel and Interface Board Assembly” on page
10“A7 and A9 Bias Tees” on page
11“A6 and A8 Test Port Couplers” on page
12“A16 or A17 Port Attenuators” on page
13“A22 Input Amplifier Assembly” on page
14“A23 to A26 Buffer Amplifiers” on page
15“A27 Post Regulator Board Assembly” on page
To prevent electrostatic discharge (ESD) damage, earth ground the work area and yourself. Some of the assemblies being handled in the following procedures are very sensitive to damage resulting from static discharges. Assemblies exposed to ESD may or may not continue to operate properly. Their reliability, however, will be degraded. Refer to Figure