HP Brocade 4Gb SAN c-Class BladeSystem Post and boot specifications, Port link speed LED patterns

Models: Brocade 4Gb SAN c-Class BladeSystem

1 88
Download 88 pages 3.97 Kb
Page 49
Image 49

Port link speed LED patterns

The following indicates port speeds:

No light — 1Gbps

Green — 2 Gbps

Amber — 4 Gbps

Shows Green/Amber — Invalid

POST and boot specifications

POST is a system check that is performed each time the switch is powered on, rebooted, or reset. During POST, the LEDs flash different colors. Any errors that occur during POST are listed in the error log.

The 4Gb SAN Switch performs POST when it is turned on or rebooted. Total boot time with POST is approximately three minutes.

POST can be omitted for subsequent reboots by using the fastboot command. For more information about this command, refer to the latest version of the Fabric OS command reference guide. If you suspect a problem with the switch, enable POST to obtain more information on any failure.

POST

The success/failure results of the diagnostic tests that run during POST can be monitored through the error log or the command line interface.

POST includes the following steps:

Preliminary POST diagnostics are run.

Operating system is initialized.

Hardware is initialized.

Diagnostic tests are run on several functions, including circuitry, port functionality, memory, statistics counters, and serialization.

Boot

Boot completes in approximately three minutes if POST is run. Boot includes the following tasks after POST completes:

Universal port configuration

Links initialized

Fabric is analyzed; if any ports are connected to other switches, the 4Gb SAN Switch participates in a fabric configuration

Brocade 4Gb SAN Switch for HP c-Class BladeSystem

49

Page 49
Image 49
HP Brocade 4Gb SAN c-Class BladeSystem manual Post and boot specifications, Port link speed LED patterns, Boot