Installing HyperFabric

Installing HyperFabric Switches

WARNING

Installing HyperFabric Switches

This section contains the information you need to install HyperFabric switches. As stated earlier, in this manual the term HyperFabric2 (HF2) switch refers to the functional switch (the A6384A switch chassis with one of the switch modules installed).

Before Installation

Before you install the HyperFabric switch, you should be aware of these things:

The A6384A HF2 switch is supported on the following HyperFabric software version:

HP-UX 11i v3: version B.11.31.01

HyperFabric switches are not supported by software versions earlier than those mentioned above, respectively.

To determine the version of HyperFabric you have, issue this command:

swlist grep -i hyperfabric

For the HF2 switch, we recommend that you use the rails shipped with the switch when you mount it in a standard 19-inch rack, even though the switch can be mounted in the rack by itself (without the rails).

To prevent overheating, you must leave one rack unit (1 EIA) of empty space above the HyperFabric switch.

After the HyperFabric switch is mounted in the rack, you attach the various cables to the switch.

To avoid damage to any of the cables, follow these guidelines:

If your cables have dust caps over the connectors, keep them in place until you are ready to connect them. This prevents dirt and oils from soiling any important surfaces.

Be careful not to stretch, puncture, or crush the cable.

To install an HF2 switch, see “Installing the HF2 Switch” on page 53.

52

Chapter 3

Page 52
Image 52
HP manual Installing HyperFabric Switches, Before Installation