1

Verify that the HP POD 240e NA is not in a drainage path or

 

 

flood prone area to prevent water from entering the HP POD

 

 

240e NA. HP recommends setting the HP POD 240e NA on a

 

 

raised site pad.

 

2

Verify that the water quality meets drinking water standards.

 

Adiabatic media water supply

 

 

 

 

 

Item

 

Description

Sign-off

 

 

 

 

1

 

Verify that the water pressure is between 20-70 psi (138-483

 

 

 

kPa) and that water temperature is between 1°C to 30°C

 

 

 

(34°F to 86°F).

 

2

 

Verify that the water instant flow-rate is no lower than the rated

 

 

 

 

flow of the fill solenoid valve (1.5 gpm maximum flow per

 

 

 

 

adiabatic unit, maximum instantaneous.)

 

3

 

Verify that water hardness is no greater than 40degFH or

 

 

 

equal to 400 ppm of CaCO3.

 

4

 

Verify that demineralized water (preferred) or drinking

 

 

 

(potable) water is used.

 

Power requirements

 

 

 

 

Item

Description

Sign-off

 

 

 

1

Verify that the following requirements are complete:

 

 

Short circuit analysis

 

 

Arc flash study

 

 

Circuit breaker coordination studies

 

 

 

 

2

Verify that the power installation work is completed according

 

 

to the approved conduit routing drawings that show the exact

 

 

routes, plan view, sections, and elevations.

 

3

Verify that temporary site power for installation and

 

 

construction is planned and available.

 

4

Verify adequate site power (on page 13) per HP POD 240e

 

 

NA requirements.

 

General

 

 

 

 

 

Item

Description

Sign-off

 

 

 

1

Verify the utility connection including the main utility

 

 

transformers and metering equipment.

 

2

Verify the third-party commissioning services that might be

 

 

required by the owner.

 

3

Verify that the HP Project Team activities are coordinated with

 

 

other site construction activities.

 