Index
A
areas prone to lightning or power surges 21 assembly area 23
B
before you contact HP 31 BSMI notice 33
C
capacities 6
cold aisle clearance 10
cold weather considerations 21 connection portals 16 contacting HP 31
D
demarcation box 18 dimensions 7 drain location 13
E
electrical 13
environmental considerations 21 environmental control system (ECS) 16 environmental risks 21
F
facility connections 16 fire and safety 19 fire box 18
fire detection 6 future expansions 9
G
grounding requirements 10
H
HP contact information 31
HP site preparation drawing package 22
J
Japanese notice 33
L
Locations for the HP POD 240e NA and equipment 23
M
modifications, FCC notice 33
O
Other structures 24 overview 5
P
power 13 
R
regulatory compliance identification numbers 33 regulatory compliance notices 32, 33 regulatory compliance, HP POD 240e NA 32
S
safety and NEC compliance  | 5  | ||
safety considerations  | 33  | 
  | |
safety information 33  | 
  | 
  | |
seismic activity  | 21  | 
  | 
  | 
site assessment  | 22, 25  | 
  | |
site planning considerations  | 23  | ||
site preparation  | 6  | 
  | 
  | 
site readiness checklist  | 28  | 
  | |
site requirements | 7, 22  | 
  | |
site safety and security  | 6  | 
  | |
supported facility connections  | 16  | ||
Index 38