Every site must have sufficient clearance for assembly, maintenance, and service, including such handling devices as a forklift, scissor lift, boom lift, or crane. Be sure to provide adequate space around the HP POD 240e NA for airflow and cooling purposes.

IMPORTANT: Shaded areas indicate required clearances.

Top view clearances shown

End view clearances shown

Site requirements 8

Page 8
Image 8
HP Performance Optimized Data Center (POD) 240a manual Site requirements