•Mandatory

•Prohibition

•Indication

•Warning Triangle

These signs will give advice for your safety.

Before leaving our factory every machine is thoroughly tested.

Follow our instructions strictly and your machine will give you long service in normal operating conditions.

1.  Features

Use: Surface grinding of concrete or other types of flooring. For repairing horizontal surfaces that have been damaged by the weather, or by improper finishing methods, or that require removal of deteriorated coatings, overlays, or buildups.

Tools:

1)2 x 2 x 4” (50 x 50 x 100 mm) size, Six (6) per unit. In any of the types shown below:

a)Grinding Stones [FIG. 14]

b)Tungsten Carbide Segment Block [FIG. 16].

c)Tungsten Carbide Impregnated Grinding Block (Not Shown)

d)Scarifier Blocks (Star, Beam, TC wheels) [FIG. 27 & FIG. 28].

e)Wire Brushes [FIG. 26].

f)Diamond Blocks [FIG. 15].

2)Multi-Segmented Diamond Disks: Two (2) disks per unit, 10” (250 mm) diameter, 10 or 20 diamond segments on each disk [FIG. 24 & FIG. 25].

3)Tool Holding Pad, with “hook-and-loop” type of tool attachment, holds the following [FIG. 19]:

a)Scrubbing Pad [JJ] [FIG. 19]: Two (2) pads per unit, 10” (250 mm) diameter, Nylon mesh Impregnated with Silicon Carbide.

(For information contact your Dealer)

Depth of Cut (Maximum):

See Section 4 (Tool Installation & Application).

Maximum material Size: N/A

Nominal & Operating Weight: See “Specifications”.

Dimensions, Grinding Width, Spindle Shaft RPM: See “Saw Dimensions”.

Before starting up machine make sure you read these instructions and are familiar with the operation of this machine.

The working area must be completely clear, well lit and all safety hazards removed (no water or dangerous objects in the vicinity).

The operator must wear protective clothing appropriate to the work he is doing.

We recommend hearing, respiratory and eye protection.

Any persons not involved in the work, should leave the area.

Only work on flat horizontal areas. Working on steep slopes or hills could cause the operator to lose control of the machine. This could result in injury or death to the operator or other persons in or near the work area!

2.Assembly

When unpacked, this unit is fully assembled, except for installation of the grinding “tools”. For tool installation See Section 4 of this document.

The dealer or end user must do the installation of optional or accessory items, such as a water tank kit.

3. Check Before Operating

All Models:

Take into account the working conditions from a health and safety point of view.

For start up refer to the engine, or motor manual.

Electric Models:

The applicable national and local electrical codes and enforcement bodies will be the determining authority on the proper connec- tions and use of this machine. In all cases it

is the operator/owner’s responsibility to ensure that this equipment is in full compliance with these codes.

24

Page 24
Image 24
Husqvarna RG 2112 E manuel dutilisation  Features, Assembly, Check Before Operating, All Models, Electric Models