SM2547-1

Service Manual

7.MAINTENANCE Maintenance Intervals

After about 1 500 running hours or 500 000 SLIDE LIFTER cycles at a room temperature of 0 - 40°C (32 - 104°F) we recommend maintenance by an authorized Kodak Service.

When the projector is operated in a dusty environment or in an enclosed area, maintenance should be done every 1000 operating hours or less, depending on the quantity of dust.

When operating in an enclosed area, supply the necessary air and exhaust. If needed, the enclosure should have

an additional fan.

Maintenance Procedure

Open the projector. Clean with a dust cleaning device.

The following structural components should be dismounted, cleaned, if necessary parts replaced, lubricated and assembled.

Component

Page

 

 

Upper Housing

4-1

Center Housing

4-4/5/6/7

Fan, Keyboard PCB and Tray Motion PCB

4-8/9

Transformer, Power Supply PCB and Back Panel Assy

4-11

Mechanism Frame and Lens Mount

4-12

Lens Mount

4-13/14

Mechanism Frame

4-15/16/17

Cleaning of the other parts and structural components depends on how dirty they are.

See Item 4 DISASSEMBLY/ASSEMBLY.

Cleaning

It is important to clean the parts of the magazine drive and the diapositive transporter. See center housing, mechanism frame and lens mount. These parts should be cleaned throughly with a cleaner that does not damage the material.

Kodak AG, Stuttgart

7-1

03/98

Page 131
Image 131
Kodak 9020/CINE service manual Maintenance Procedure, Cleaning