1.Feed pipe and fitting at least ½ ! ‘’

2.No filters in feed line

3.Slope in feed line > 1%!

4.Only use ball valves!

5.Operating pressure: min. 12 psig max. 240 psig

6.Short pressure hose!

7.For each metre of rising slope in the outlet line, the required mini- mum pressure will increase by 1.5 psig.

The rise of the outlet line must not exceed 17 feet!

8.Lay collecting line (min. ½” ) with 1% of slope.

9.Lead discharge pipe from the top into collecting line.

wrong • no correcto

correct • correcto

incorrect • incorrecto

correct • correcto

Note: Pressure differences!

Each condensate source must be drained separately!

Note: Venting!

If the feed line cannot be laid with sufficient slopeor if there are other inflow problems, it will be necessary to install a venting line!

<

>77

<

Note: Deflector area!

If drainage is to take place directly from a line, it is advisable to arrange the piping so that the air flow is di- verted.