Starting the IP | |
|
|
SECTION 6. STARTING THE IPLDK-20 SYSTEM
6.1 Before Starting the IP LDK-20 System
The DIP switch (SW1) of Memory Backup Battery should be turned ON before installing the MBUB, to protect system data in the case of a power failure. To prepare for preprogramming, perform the following Steps:
1. Set the DIP switch (SW3) on the MBUB to ON.
To initialize all the data in Admin Programming, the 4th pole of SW3 should be set to ON. Plug the AC power cord into the IP
Program the Country Code as applicable. Reset the IP
Set the 4th pole of SW3 on the MBUB to OFF when the system operates normally. The 4th pole of SW3 is set to OFF, to protect the various features addressed by Admin Programming after system
6.2 Basic Preprogramming
The IP
-PC ADMIN : Refer to the PC ADMIN Programming Manual.
-DKTU : In this manual we explain DKTU (Station 10) in ADMIN Programming.
6.2.1 DKTU (Station 10) programming
All programming is done at Station 10 (Station port # 00) using the
Additional programming stations may be assigned (PGM 113 – FLEX 1), but only 1 DKTU can be active in the programming mode at any one time.
When in programming mode, Station 10 does not operate as a normal telephone, but instead works as a programming instrument with all of the buttons redefined. The keys of the dial pad are used to enter the various data fields and to enter numerical information:
-Flexible Buttons
The 24 buttons located at the top of the phone are used to indicate a specific data field and to enter information.
-SPEED Button and * Key
Are sometimes used to delete data or to indicate the end of data input.
-REDIAL Button
Could be used to delete one digit or character from the end of entered digits or characters.
65