IP LDK-20 Installation Manual

Board Installation

 

 

LED indications

LED

Functions

Remark

LD1

DSP HINT interrupt LED (ON: Active, OFF: Idle)

 

LD2

Periodic toggle – ON: 1 sec., OFF: 1 sec.

 

LD3

Channel8 Seize indication LED (ON: Busy, OFF: Idle)

 

LD4

Channel7 Seize indication LED (ON: Busy, OFF: Idle)

 

LD5

Channel6 Seize indication LED (ON: Busy, OFF: Idle)

 

LD6

Channel5 Seize indication LED (ON: Busy, OFF: Idle)

 

LD7

Channel4 Seize indication LED (ON: Busy, OFF: Idle)

 

LD8

Channel3 Seize indication LED (ON: Busy, OFF: Idle)

 

LD9

Channel2 Seize indication LED (ON: Busy, OFF: Idle)

 

LD10

Channel1 Seize indication LED (ON: Busy, OFF: Idle)

 

LD11

VOIB DSP operation status LED (ON: Normal, OFF: Fail)

 

LD12

VOIU DSP operation status LED (ON: Normal, OFF: Fail)

 

MJ1-LD1

Link Status LED (ON: Link, Toggle: Data transfer)

 

MJ1-LD2

Speed Status LED (ON: 100Mbps operation, OFF: 10Mbps)

 

4.5.1 Pin assignment

Connector

Pin Number

NO

SIGNAL NAME

FUNCTION

 

 

 

 

 

RJ45

 

4,5,7,8

RESERVED

 

 

1

TX+

Transmit Data

 

 

2

TX-

Transmit Data

 

 

3

RX-

Receive Data

 

 

6

RX+

Receive Data

NOTE

-10BASE-T runs on Category 3 UTP or higher.

-100BASE-TX runs only on Category 5 UTP cable.

57

Page 61
Image 61
LG Electronics IP LDK-20 installation manual Pin assignment, LED indications, Led, Signal Name Function