
How to do a control solution test:
STEP 1 Insert Test Strip. |
| |
To turn on the meter, insert a test strip, |
| |
contact bars end first and facing up, into the |
| |
test port. Push it all the way in until it will |
| |
go no further. |
| |
“OneTouch UltraSmart” will appear briefly | (Example) | |
on the display. | ||
|
Then “Code 9 (example), Check Code” is displayed. Be sure the meter and test strip codes match. If they do not, code the meter correctly (see page 10).
15