Lincoln Electric SVM167-A service manual Main Transformer Test, Test Procedure

Models: SVM167-A

1 99
Download 99 pages 53.14 Kb
Page 48
Image 48

Return to Section TOC

Return to Section TOC

Return to Master TOC

Return to Master TOC

F-12

TROUBLESHOOTING AND REPAIR

F-12

MAIN TRANSFORMER TEST (continued)

FIGURE F.1. – OUTPUT SELECTOR SWITCH TERMINALS

X2

X3

X4 X5 X6

X7 X8

 

 

 

Return to Section TOC

Return to Master TOC

TEST PROCEDURE

WARNING

THE ON/OFF POWER SWITCH will be “hot” during these tests.

NOTE: Secondary voltages will vary proportionately with the primary input voltage.

1.Disconnect the main input power supply to the machine.

2.Remove the case top and side panels with a 3/8” nutdriver.

6.Locate leads X9 and X10. See Figure

F.3.

7.Connect main input power to the machine.

8.Turn the POWER MIG 215 ON/OFF Power Switch to the ON position.

WARNING

ELECTRIC SHOCK can kill.

Do not touch electrically live parts such as output terminals or internal wiring.

All input power must be electri- cally disconnected before pro- ceeding.

Return to Section TOC

Return to Master TOC

3.Remove the tool tray with a 5/16” nut driver.

4.Locate leads X2 thru X8 located on the output selector switch. See Figure F.1.

5.Locate lead X1 located on the output rectifier assembly. See Figure F.2.

9.Carefully make the following voltage tests. See Table F.1.

10.Turn off the machine.

11.If any of the voltages are incorrect or missing, check for loose or broken connections between the main transformer and the test points.

POWER MIG® 215

Page 48
Image 48
Lincoln Electric SVM167-A Main Transformer Test, Test Procedure, ON/OFF Power Switch will be hot during these tests