Install
A Natural Gas Pipe Size Chart
Gas valve replacement
Dimension
Maintenance
Configuration of the cascade
Connecting gas supply piping
Address reported problems
Navigation Dial Press Or Turn Reset Key
2 Burner Assembly
Page 75
Image 75
Installation & Operation Manual
Notes
75
Page 74
Page 76
Page 75
Image 75
Page 74
Page 76
Contents
Save this manual for future reference
Installation&OperationManual Models: 151 -
AWII-I-ORev C
WHAT TO DO IF YOU SMELL GAS
Contents
Hazard definitions
DANGER
CAUTION CAUTION NOTICE
Water heater operation –
When servicing the water heater –
Installation & Operation Manual
Please read before proceeding
Installation & Operation Manual
The Armor Water Heater - How it works
Rear View - Model
Models 151 -
Rear View - Models 151 -
Left Side inside unit - Models 151 -
Left Side inside unit - Models 400 -
Models 400 -
Models 601 -
Rear View - Models 400 -
Ratings
Notes
Installation & Operation Manual
1 Determine water heater location
Installation must comply with
Closet and alcove installations
Clearances for service access
Installation & Operation Manual
1 Determine water heater location continued
Vent and air piping
Residential garage installation
Precautions
Provide air openings to room
1 Determine water heater location continued
Table 1A Corrosive Contaminants and Sources
Products to avoid
Areas likely to have contaminants
1 Determine water heater location
Installation & Operation Manual
Models 151 -
2 Prepare water heater
Gas conversions
Remove water heater from wood pallet
Installation & Operation Manual
Figure 2-3 Installing Propane Orifice - Model
Figure 2-4 Gas Valve Adjustment - Model
Model
Leveling the water heater
Figure 2-5 Gas Valve Adjustment - Models 601 -
2 Prepare water heater continued
Models 601 -
Direct venting options - Sidewall Vent
3 General venting
Installation & Operation Manual
3 General venting continued
Direct venting options - Vertical Vent
Figure 3-7 PVC/CPVC Vertical Vent, Sidewall Air
PVC/CPVC Vent piping materials
Install vent and combustion air piping
Requirements for installation in Canada
Installing vent or air piping
3 General venting continued
PVC/CPVC Air intake/vent connections
Table 3A Vent Pipe, and Fittings
Installation & Operation Manual
3 General venting
Air inlet pipe materials
Stainless steel vent
Installation & Operation Manual
Saf-TVent
Z Flex
Model
FasNSeal
Removing from existing vent
Kit Number
Equivalent Vent
Length
Description
Optional room air
Vent, air piping and termination
Table 3F Optional Room Air Kit
Model
If using the alternate sidewall termination
4 Sidewall direct venting
Vent/air termination - sidewall
Vent/air termination – sidewall
4 Sidewall direct venting continued
Figure 4-3A Clearance to Gravity Air Inlets
Installation & Operation Manual
Centerline Width
Figure 4-5A Sidewall Termination Assembly
Table 4B Sidewall Vent Centerline Dimensions
Vent
4 Sidewall direct venting continued
Multiple vent/air terminations
Termination and fittings
Installation & Operation Manual
Description and usage
Sidewall termination installation
Figure 4-8 Kit Contents_CVK3003 - Models 151 -
Figure 4-9 Kit Contents_CVK3007 - Models 286 -
Vent
Figure 4-10 Concentric Vent Dimensional Drawing
Dimensional
Figure 4-11 Concentric
4 Sidewall direct venting
Figure 4-13 Concentric Vent Sidewall Attachment
Multiventing sidewall terminations
Installation & Operation Manual
Determine location
5 Vertical direct venting
Vent/air termination – vertical
Installation & Operation Manual
5 Vertical direct venting
Prepare roof penetrations
Multiple vent/air terminations
Installation & Operation Manual
Figure 5-4 Concentric Vertical Termination
Vertical termination installation
Figure 5-5 Do Not Install U-Bendto Rain Cap
5 Vertical direct venting continued
5 Vertical direct venting
Figure 5-6 Concentric Vent Roof Installation
Multiventing vertical terminations
Installation & Operation Manual
Inlet Size
Alternate vertical concentric venting
Vent / Air
Minimum Existing
5 Vertical direct venting
Existing vent as a chase
Figure 5-10 Existing Vent as a Chase
Installation & Operation Manual
6 System piping
Flow switch and relief valve installation
Flow switch adjustment
Figure 6-2 Flow Switch Adjustment
Piping components
Temperature and pressure relief valve
Temperature Rise
Scalding
HIGH TEMPERATURE
6 System piping continued
Installation & Operation Manual
140 HOT WATER SUPPLY LOW TEMPERATURE BUILDING
BUILDING RETURN
COLD WATER SUPPLY
HOT WATER SUPPLY
STORAGE TANK
RETURN
Figure 6-6 Single Heater - Double Tank
COLD WATER SUPPLY
HOT WATER SUPPLY
COLD WATER
Number of Units
Model
Required Pipe Sizes in NPT
Number of Units
Figure 6-8 Double Heater - Double Tank
Installation & Operation Manual
6 System piping continued
Figure 7-3 Gas Supply Piping - Model
Connecting gas supply piping
7 Gas connections
Figure 7-1 Gas Supply Piping - Models
Propane gas
Figure 7-5 Inlet Pipe with Backup Wrench
7 Gas connections continued
Natural gas
Single Unit
Table 7A Natural Gas Pipe Size Chart
Natural Gas Pipe Capacity Chart
Check inlet gas supply
Figure 7-7 Inlet Gas Supply Check - Model
Gas valve replacement
Gas pressure
Figure 7-6 Inlet Gas Supply Check - Models 151 -
Figure 8-2 Routing Field Wiring Models 151 -
8 Field wiring
Installation must comply with
Figure 8-1 Line Voltage Field Wiring Connections
High gas pressure switch
8 Field wiring continued
Low gas pressure switch
Louver proving switch
8 Field wiring
Alarm contacts
Wiring of the cascade
Runtime contacts
Figure 8-3 Low Voltage Field Wiring Connections
8 Field wiring continued
Installation & Operation Manual
Installation & Operation Manual
9 Condensate disposal
Condensate drain
Figure 9-1 Condensate Disposal
Chlorine concentration less than 200 ppm
10 Start-up
Check for gas leaks
Inspect/fill condensate system
Check system and water heater
Final checks before starting the water heater
Start the water heater
If water heater does not start correctly
Figure 10-2 Operating Instructions - Models 151 -
FOR YOUR SAFETY READ BEFORE OPERATING
OPERATING INSTRUCTIONS
TO TURN OFF GAS TO APPLIANCE
Figure 10-3 Operating Instructions - Models 400 -
Installation & Operation Manual
10 Start-up
Set water heater operation
Table 10A Flue Products Chart
Set tank set point temperature
Check flame and combustion continued
NOTICE
Configuration of the cascade
Set clock
10 Start-up
11 Operating information
Temperature control
Protection features
0 - 10VDC input set point or power
Error logging
Water heater temperature regulation
Runtime and alarm outputs
Service reminder
Cascade
Access modes
Installer
11 Operating information continued
11 Operating information
Sequence of operation
OPERATION
DISPLAY
NAVIGATION DIAL PRESS OR TURN RESET KEY
Armor water heater control module
Figure 11-1 Control Panel
Installation & Operation Manual
Status Bar
Indicators
Water heater
Call for Heat
LEFT SELECT
Information
key function
Operational
RIGHT SELECT
Dial Function
key function
NAVIGATION
Table 12A Service and Maintenance Schedules
12 Maintenance Maintenance and annual startup
Service technician
Owner maintenance
Inspect water heater area
12 Maintenance
Address reported problems
Clean condensate trap
Check control settings
12 Maintenance continued
Check ignition ground wiring
Check all water heater wiring
Perform start-upand checks
Check flame signal
Cleaning heat exchanger
Figure 12-2 Burner Assembly
Part
Table 12B Heat Exchanger Cleaning Kits
Check Delta T
Oiled bearing circulators
are connected or a fault condition is present
13 Diagrams
Figure 13-1 Ladder Diagram
Installation & Operation Manual
LOW VOLTAGE 120 VAC HIGH VOLTAGE
Figure 13-2 Wiring Diagram
Installation & Operation Manual
13 Diagrams continued
Installation & Operation Manual
Installation & Operation Manual
AWII-I-ORev C 4/11