Installation & Operation Manual

5Vertical direct venting (continued)

Vent/air termination – vertical

Prepare roof penetrations

1.Air pipe penetration:

a.Cut a hole for the air pipe. Size the air pipe hole as close as desired to the air pipe outside diameter.

2.Vent pipe penetration:

a.Cut a hole for the vent pipe. For either combustible or noncombustible construction, size the vent pipe hole with at least a 1/2 inch clearance around the vent pipe outer diameter:

5½ inch hole (140 mm) hole for 4 inch (102 mm) vent pipe

7½ inch hole (191 mm) hole for 6 inch (152 mm) vent pipe

b.Insert a galvanized metal thimble in the vent pipe hole (when required by local codes).

3.Space the air and vent holes to provide the minimum spacing shown in FIG.’s 5-1A and 5-1B, page 30.

4.Follow all local codes for isolation of vent pipe when passing through floors, ceilings, and roofs.

5.Provide flashing and sealing boots sized for the vent pipe and air pipe.

Termination and fittings

1.Prepare the vent termination coupling and the air termination elbow (FIG.’s 5-1A and 5-1B) by inserting bird screens. Bird screens should be obtained locally.

2.The air piping must terminate in a down-turned 180° return bend as shown in FIG.’s 5-1A and 5-1B. Locate the air inlet pipe no further than 2 feet (.6 m) from the center of the vent pipe. This placement avoids recirculation of flue products into the combustion air stream.

3.The vent piping must terminate in an up-turned coupling as shown in FIG. 5-1A. The top of the coupling must be at least 1 foot (.3 m) above the air intake. When the vent termination uses a rain cap as illustrated in FIG. 5-1B maintain at least 36" (914 mm) above the air inlet. The air inlet pipe and vent pipe can be located in any desired position on the roof, but must always be no further than 2 feet (.6 m) apart and with the vent termination at least 1 foot (.3 m) above the air intake.

4.Maintain the required dimensions of the finished termination piping as shown in FIG.’s 5-1A and 5-1B.

5.Do not extend exposed vent pipe outside of building more than shown in this document. Condensate could freeze and block vent pipe.

Multiple vent/air terminations

1.When terminating multiple Knight XL boilers, terminate each vent/air connection as described in this manual (FIG. 5-2).

Terminate all vent pipes at the same height ￿ WARNING and all air pipes at the same height to

avoid recirculation of flue products and the possibility of severe personal injury, death, or substantial property damage.

2. Place roof penetrations to obtain minimum clearance of 12 inches (305 mm) between edge of air intake elbow and adjacent vent pipe of another boiler for U.S. installations (see FIG. 5-2). For Canadian installations, provide clearances required by CSA B149.1 Installation Code.

3. The air inlet of a Knight XL boiler is part of a direct vent connection. It is not classified as a forced air intake with regard to spacing from adjacent boiler vents.

Figure 5-2Vertical Terminations with Multiple Boilers

12" (305 MM) MINIMUM VERTICALLY FROM VENT OUTLET TO ANY AIR INLET

 

VENT

 

AIR

 

12" (305 MM) MINIMUM FROM EDGE

VENT

OF AIR INTAKE PIPE TO ADJACENT

AIR

VENT PIPE FROM ANOTHER BOILER

 

Figure 5-3Alternate Vertical Terminations with Multiple Boilers

VENT

VENT

12" (305 MM) MINIMUM VERTICALLY FROM VENT OUTLET TO ANY AIR INLET

AIR

AIR

31

Page 31
Image 31
Lochinvar 399 operation manual Prepare roof penetrations, 2Vertical Terminations with Multiple Boilers

399 specifications

Lochinvar 999 - 750, CF-CH(E)-i&s-08,399 is a cutting-edge boiler designed for commercial heating applications. With its robust construction and high efficiency, this model stands out in the crowded market of heating solutions.

One of the main features of the Lochinvar 999 - 750 is its exceptional thermal efficiency rating. The unit incorporates advanced condensing technology that allows it to recover heat from flue gases, which helps in achieving efficiency levels of up to 99%. This efficiency not only reduces energy consumption but also lowers operational costs, making it an excellent investment for businesses looking to minimize their carbon footprint.

The boiler is designed to provide a powerful output of 750 kW, ensuring it meets the heating demands of larger buildings or commercial spaces. Its capacity makes it suitable for a range of applications including schools, hospitals, and industrial facilities. Moreover, the unit features a built-in cascading system that enables multiple boilers to be connected, enhancing system reliability and flexibility.

In terms of technology, the Lochinvar 999 - 750 is equipped with a user-friendly touchscreen interface. This innovative control system allows operators to monitor and adjust settings with ease, providing real-time performance data and alerts for maintenance needs. The intelligent controls optimize operation to match the heating load, further enhancing energy efficiency.

Safety is a top priority with this model. It is built with multiple safety features such as automatic shut-off valves, pressure relief valves, and flame monitoring systems, ensuring safe operation under various conditions. The unit also adheres to stringent industry standards and regulations, making it a reliable choice for commercial applications.

Furthermore, the Lochinvar 999 - 750 is designed with serviceability in mind. Its compact footprint and accessible components simplify maintenance, reducing downtime and associated costs. The unit also supports a variety of fuel sources, including natural gas, propane, and biodiesel, providing flexibility to meet different facility requirements.

In summary, the Lochinvar 999 - 750, CF-CH(E)-i&s-08,399 represents a blend of efficiency, reliability, and safety in commercial heating. Its advanced technologies and thoughtful design make it a powerful solution for various heating needs, making it an ideal choice for businesses aiming for excellence in energy management and operational efficiency.