Lochinvar 399 1Determine boiler location continued, Installation & Operation Manual

Models: 399

1 76
Download 76 pages 58.86 Kb
Page 9
Image 9
1Determine boiler location (continued)

Installation & Operation Manual

1Determine boiler location (continued)

Figure 1-1Closet Installation - Minimum Required Clearances

CLOSET INSTALLATION

￿

For closet installations, CPVC or

1" (25 MM) MINIMUM CLEARANCE AROUND HOT WATER

PIPES AND VENT PIPE

12" (305 MM)

For closet installations, CPVC orLEFT

14" (356 MM)

REAR Manual background

RECOMMENDED SERVICE CLEARANCES:

Front

-

30" (762 mm)

Top

-

24" (610 mm)

Left Side - 24" (610 mm)

Rear - 24" (610 mm)

6" (152 MM)

F RONT

WARNING stainless steel material MUST BE

used in a closet structure due to elevated temperatures. Failure to follow this warning could result in

13" (330 MM) fire, personal injury, or death.

TOP

VENTILATING*

AIR OPENING

CLOSED DOOR

VENTILATING*

AIR OPENING

6" (152 MM)

Manual background 0"

RIGHT

*AREA OF EACH OPENING:

1 SQ. INCH PER 1000 BTU PER HOUR INPUT WITH A MINIMUM OF 100 SQ. INCHES

Figure 1-2Alcove Installation - Minimum Required Clearances

1" (25 MM) MINIMUM CLEARANCE

ALCOVE INSTALLATION

 

AROUND HOT WATER

 

PIPES AND VENT PIPE

 

12"Manual background (305 MM)

LEFT

14" (356 MM)

REAR Manual background

￿WARNING

13" (330 MM)

TOP

For alcove installations, CPVC or stainless steel material MUST BE used in an alcove structure due to elevated temperatures. Failure to follow this warning could result in fire, personal injury, or death.

OPEN

FRONT

RECOMMENDED SERVICE CLEARANCES:

 

Front

-

30" (762 mm)

 

Top

-

24" (610 mm)

18" (457 MM)

Left Side - 24" (610 mm)

FRONT

 

Rear -

 

24" (610 mm)

 

0"

RIGHT

9

Page 9
Image 9
Lochinvar 399 1Determine boiler location continued, Installation & Operation Manual, For closet installations, CPVC or