Step 8 Connect Battery Pack (Optional)

There are two ways to install a battery pack onto the Series 471 MegaRAID Enterprise 1600 160M RAID controller. The first way is to use a DIMM with a battery backup attached to it.

The battery pack is shown in the bottom view of the DIMM socket below. Pin 1 on the cable from the battery pack is usually denoted by a red wire. The caution information appears on the battery module as shown below.

J23Battery Connector Pinout

 

Pin

Description

 

 

1

VBAT1+ (red wire)

 

 

2

TSENSE (white wire)

 

 

3

VBAT- (black wire)

 

 

4

BATDQ

 

 

5

Ground

 

 

 

 

 

Cont’d

62MegaRAID Enterprise 1600 Hardware Guide