2. Installation
Upsilon STS 30 to 250 A | Input: | 3 phases + PEN |
| Output: | 3 phases + PE |
See section 1.3 for information on accessing the connections.
Connections are made using lugs connected to threaded studs (diameter 8 mm).
The cables are tied to the earth bar.
N L1 L2 L3
N L1 L2 L3N L1 L2 L3
| N |
|
PEN | PE | PEN |
|
| 275 mm |
| S1 | S2 |
Upsilon STS 30 to 250 A Input: 3 phases + PE + Neutral Output: 3 phases + PE + Neutral
See section 1.3 for information on accessing the connections.
Connections are made using lugs connected to threaded studs (diameter 8 mm).
The cables are tied to the earth bar.
N L1 L2 L3
N L1 L2 L3N L1 L2 L3
NNN
PE PE PE
275 mm
S1 | S2 |
Upsilon STS 30 to 250 A | Input: 3 phases + PE |
| Output: 3 phases + PE |
See section 1.3 for information on accessing the connections.
Connections are made using lugs connected to threaded studs (diameter 8 mm).
The cables are tied to the earth bar.
N L1 L2 L3
N L1 L2 L3N L1 L2 L3
PE PE PE
275 mm
S1 | S2 |
34020113EN/AA - Page 13