2. Installation

Upsilon STS 30 to 250 A

Input:

3 phases + PEN

 

Output:

3 phases + PE

See section 1.3 for information on accessing the connections.

Connections are made using lugs connected to threaded studs (diameter 8 mm).

The cables are tied to the earth bar.

N L1 L2 L3

N L1 L2 L3N L1 L2 L3

 

N

 

PEN

PE

PEN

 

 

275 mm

 

S1

S2

Upsilon STS 30 to 250 A Input: 3 phases + PE + Neutral Output: 3 phases + PE + Neutral

See section 1.3 for information on accessing the connections.

Connections are made using lugs connected to threaded studs (diameter 8 mm).

The cables are tied to the earth bar.

N L1 L2 L3

N L1 L2 L3N L1 L2 L3

NNN

PE PE PE

275 mm

S1

S2

Upsilon STS 30 to 250 A

Input: 3 phases + PE

 

Output: 3 phases + PE

See section 1.3 for information on accessing the connections.

Connections are made using lugs connected to threaded studs (diameter 8 mm).

The cables are tied to the earth bar.

N L1 L2 L3

N L1 L2 L3N L1 L2 L3

PE PE PE

275 mm

S1

S2

34020113EN/AA - Page 13

Page 13
Image 13
MGE UPS Systems 30A user manual Upsilon STS 30 to 250 a Input Phases + PEN Output