MGE UPS Systems 30A user manual Power connections

Models: 30A

1 30
Download 30 pages 30.47 Kb
Page 12
Image 12

2. Installation

2.2 Power connections

See section 6.1 for information on sizing protection devices and cables (Appendix, Technical data).

Two cables maximum may be used per phase.

Upsilon STS 30 to 250 A

Input: 3 phases + PEN

 

Output: 3 phases + PEN

See section 1.3 for information on accessing the connections.

Connections are made using lugs connected to threaded studs (diameter 8 mm).

The cables are tied to the earth bar.

N L1 L2 L3 N L1 L2 L3 N L1 L2 L3

N

PEN PEN PEN

275 mm

S1

S2

Upsilon STS 30 to 250 A

Input:

3 phases + PEN

 

Output:

3 phases + PE + Neutral

See section 1.3 for information on accessing the connections.

Connections are made using lugs connected to threaded studs (diameter 8 mm).

The cables are tied to the earth bar.

N L1 L2 L3 N L1 L2 L3 N L1 L2 L3

N

PEN PE PEN

275 mm

S1

S2

Page 12 - 34020113EN/AA

Page 12
Image 12
MGE UPS Systems 30A user manual Power connections