MGE UPS Systems 5000 RT Operation, Initial Start-Up, Final Start-Up Sequence, UPS Set-Up

Models: 5000 RT

1 44
Download 44 pages 52.94 Kb
Page 23
Image 23

Operation

3.1 Initial Start-Up

To ensure that your system is configured in complete accordance with safety regulations and to benefit from the manufacturer’s warranty, please contact Technical Support.

22

1. Check that the battery disconnect switch (60) on top cover is connected (see section 2.2 Internal Battery Connection).

2. Set the upstream circuit breaker (not included) to the on position.

The equipment is powered via the Normal AC source, but not protected by the UPS.

Batteries are recharging, an 8 hour recharge period is necessary to get full backup time.

LED (22) is ON, LEDs (33) and (34) are green.

33 34

UPS Set-Up

i

If UPS personalization is desired, it is advised to enter the personalization mode at this time (see the 4.4

"Personalization" section).

3.2 Final Start-Up Sequence

20 21 22

3. Press and hold the "I" (on) button (29) for 3 seconds.

The buzzer beeps once, and after UPS internal test sequence, the LED (20) is ON.

LEDs (30), (32), (34) are green.

The equipment is protected by the UPS.

If LED (21) or (22) is ON, an alarm has occurred (see the "troubleshooting" section).

30

32

34

29

86-87050-00 A01

Operation

3 — 1

Page 23
Image 23
MGE UPS Systems 5000 RT user manual Operation, Initial Start-Up, Final Start-Up Sequence, UPS Set-Up