
Maintenance
7.1 Hot Swapping the Power Sub-Module
This operation must be carried out by qualified electrical personnel only.
This operation can be performed without interrupting the equipment.
Disconnecting the power
Reconnecting the power
1.Remove the 6 mounting screws to free the main front panel bezel.
2.Place the front panel above the UPS.
3.Remove the 2 mounting screws on each side of the power
4.Withdraw the power
Note: There is a safety pin at the rear of the module. Lift the
When reconnecting the
◗Carry out the above instructions in reverse order.
◗Replace the faulty power
7.2Hot Swapping the Battery Sub-Module
This operation must be carried out by qualified electrical personnel only.
The battery can cause electrocution and high
◗Remove watches, rings, bracelets and all other metal objects from the hands and arms,
◗Use tools with an insulated handle.
This operation can be performed without interrupting the equipments.
This operation must be carried out by qualified electrical personnel only.
Disconnecting the battery sub-module (87101):
1. Remove the 6 mounting screws to free the main front panel bezel.
2. Place the front panel above the UPS.
3. Remove the 4 mounting screws on the sides of the battery
4. Withdraw the battery
Reconnecting the battery sub-module:
Carry out the above instructions in reverse order.
To ensure safety and high performance, use only batteries supplied by MGE UPS SYSTEMS.
Caution! The battery is heavy
(approx. 60 lbs.).
Maintenance | 7 — 1 |