
| Hardware Installation | |
|
| |
| Installation Checklist (Continued) | |
|
|
|
CN5 | Parallel Port | LPT |
CN6 | Universal Serial Port 1 | USB1 |
CN7 | Universal Serial Port 2 | USB2 |
CN18 | Audio/GAME Port | AUDIO/GAME |
CN35 | LAN | |
|
| |
| Speaker and Power LED Connectors | |
PW | Power On/Off and Suspend Switch Connector | |
SL | Standby LED Connector |
|
HL | HDD LED Connector |
|
RS | Reset Button Connector |
|
|
| |
| Speaker and Power LED Connectors | |
PWRLED | Power LED |
|
SPK | Speaker Connector |
|
|
| |
| Jumpers and Switches | |
JP1 | K/B Power |
|
JP3 | USB1,2 Power |
|
JP5 | CPU Clock |
|
JP8 | Check 1.5V AGP (optional) |
|
JP9 | Clear CMOS |
|
|
|
|
2.2. Installation Steps
You need to complete the following installation steps before you can use your PC.
•Check and set the mainboard settings;
•Install the Central Processing Unit (CPU);
•Install the memory modules;
•Install the expansion cards;
•Connect the ribbon cables, panel wires and power supply;
•Setup the system BIOS.
Before you start installing your mainboard we strongly recommend that you use a grounded
The
Page 11