SECTION 4 – INSTALLATION
4-1. Installing Welding Generator
Movement
YDo Not Lift Unit From End
Airflow Clearance
18in
(460 mm)
Location
18 in
18 in
(460 mm)
OR
(460 mm)
18 in | 18 in | |
(460 mm) | ||
(460 mm) | ||
|
OR
Grounding | 1 | 3 |
|
GND/PE
OR
Electrically bond generator frame to vehicle frame by
2contact.
4 | Y Always ground generator frame to ve- | |
| hicle frame to prevent electric shock | |
|
| |
|
| and static electricity hazards. |
| 1 | Generator Base |
| 2 | Metal Vehicle Frame |
| 3 | Equipment Grounding Terminal |
| 4 | Grounding Cable |
| Use #10 AWG or larger insulated copper wire. | |
| Y If unit does not have GFCI receptacles, | |
| 2 | use |
|
|
install1 12/99 – Ref.
4-2. Connecting The Battery
Tools Needed:
1/2 in
Y Connect
+ | Negative | |
Cable Last | ||
|
–
Ref.
4-3. Installing Muffler
Y Stop engine and let cool.
Y Do not blow exhaust toward air cleaner or air intake.
Tools Needed:
1/2 in
muff1 4/96 –