SECTION 4 – INSTALLATION

4-1. Installing Welding Generator

Movement

YDo Not Lift Unit From End

Airflow Clearance

18in

(460 mm)

Location

18 in

18 in

(460 mm)

OR

(460 mm)

18 in

18 in

(460 mm)

(460 mm)

 

OR

Grounding

1

3

 

GND/PE

OR

Electrically bond generator frame to vehicle frame by metal-to-metal

2contact.

4

Y Always ground generator frame to ve-

 

hicle frame to prevent electric shock

 

 

 

 

and static electricity hazards.

 

1

Generator Base

 

2

Metal Vehicle Frame

 

3

Equipment Grounding Terminal

 

4

Grounding Cable

 

Use #10 AWG or larger insulated copper wire.

 

Y If unit does not have GFCI receptacles,

 

2

use GFCI-protected extension cord.

 

 

install1 12/99 – Ref. ST-800 652 / Ref. ST-800 477-A / ST-158 936-A / S-0854

4-2. Connecting The Battery

Tools Needed:

1/2 in

Y Connect

+

Negative (–)

Cable Last

 

Ref. ST-138 751-B / Ref. ST-191 898 / Ref. S-0756-C

4-3. Installing Muffler

Y Stop engine and let cool.

Y Do not blow exhaust toward air cleaner or air intake.

Tools Needed:

1/2 in

muff1 4/96 – ST-154 088-B / Ref. ST-191 898

OM-477 Page 14

Page 18
Image 18
Miller Electric Big 40G manual Installation, Installing Welding Generator, Connecting The Battery, Installing Muffler