3.0INSTALLATION AND OPERATION
3.1Transportation and Installation
TABLE 3.1 How to transport and install the system
Transportation | Installation |
Transport unit with forklift. | Using the pre drilled holes (4 - 24) in the |
Carry with overhead crane using | UPS channel base, anchor the unit using |
eyebolts provided. | appropriate hardware. (Not provided) |
Note : Do not transport in a horizontal position. Cabinets must be maintained upright within +/- 15° of the vertical during handling.
3.2Installation Procedure
A)Note the load tolerance of the floor Refer to Table 3.2 for list of UPS weights.
TABLE 3.2 List of UPS weights
UPS Capacity (kVA) | 30 | 50 | 80 |
Weight (lb) | 2060 | 1810 | 1990 |
B)Minimum clearance required for ventilation
Right side | 1.0" (25 mm) (not required when sidecars are used) | |
Left side | 1.0" | (25 mm) (not required when sidecars are used) |
Back side | 0.0" | (0.0 mm) |
Top side | 23.6" (600 mm) (for air flow) |
C)Space requirement for routine maintenance
Allow for the following space at the time of installation.
Front | 39.4" (1000 mm) |