Monessen Hearth WDV500 manual installation for vertical termination, venting installation, 78D0011

Models: WDV500

1 48
Download 48 pages 40 Kb
Page 17
Image 17
installation for vertical termination

venting installation

installation for vertical termination

1.Determine the route your vertical venting will take. If ceiling joist, roof rafters or other framing will obstruct the venting system, consider an offset. Refer to Figure 20 to avoid cutting load bearing members.

For optimal flame appearance, a restrictor disk is necessary on straight vertical runs of 10' of more.

WDV Series Gas Fireplace

Roof Flashing

Wall Strap

Runs may not incorporate elbows.

The disk is part number 56D3027 and is included in installation manual packet.

Drop the disk into a 5" inner collar before installing the first section of flue or install at the last section before installing the termination.

An additional disk may be installed on runs of 35' or more. Rotate disks perpendicular to each other.

NOTE: Pay special attention to these installation instructions for required clearances (air space) to combustibles when passing through ceilings, walls, roofs, enclosures, attic rafters, etc. Do not pack air spaces with insulation. Also note maximum vertical rise of the venting system and any

FP1669

Figure 20 -

45° Elbows

Ceiling Firstop

maximum horizontal offset limitations. Offsets must fall within the parameters shown in Figures 19 and 20.

2.Set fireplace in desired location. Drop a line plumb down from the ceiling to the position of the flue exit. Mark the center point where the vent will penetrate the ceiling. Drill a small locating hole a this point.

Drop a plumb line from the inside of the roof to the ceiling locating hole in the ceiling. Mark the center point where the vent will penetrate the roof. Drill a small locating hole at this point.

flat ceiling installation

1.Cut a 10Z\x" (241 mm) square hole in the ceiling using the locating hole as a center point The opening should be framed to 10Z\x" x 10Z\x" (241 x 241 mm) inside dimen- sions as shown in Figure 22 using framing lumber the same size as the ceiling joist. If the area above the ceil- ing is an insulated ceiling or a room, nail firestop from the top side. This prevents loose insulation from falling into the required clearance space. Figure 21. Otherwise, install firestop below the framed hole. Figure 22

2.Assemble the desired lengths of pipe and elbows nec- essary to reach from the burner system flue up through the firestop. Be sure pipe and elbow connections are fully twist-locked.

Offset with Wall Strap and 45° Elbows

Nails

Firestop

Figure 21 - If Area Above is a Room, Install Firestop above Framed Hole as Shown

 

1

/

2

"

10/

10

1

"

 

 

 

 

 

 

 

 

 

2

 

 

 

 

 

 

 

FP1970

NailsFirestop

Figure 22 - If Area Above is Not a Room, Install Firestop above Framed Hole as Shown

78D0011

17

Page 17
Image 17
Monessen Hearth WDV500 installation for vertical termination, venting installation, WDV Series Gas Fireplace, 78D0011