Transceiver Performance Testing

3

General

Setup

The HT 1000, JT 1000, MT 2000, MTS 2000, and MTX series radios have been prepared to meet published specifications through their manufacturing process, with the use of laboratory-quality test equipment of highest accuracy. The recommended field service equipment approaches the accuracy of the manufacturing equipment with a few exceptions. Accuracy of the equipment must be maintained in compliance with the manufacturer’s recommended calibration schedule.

Supply voltage can be connected from the battery eliminator. The equipment required for alignment procedures is connected as shown in the Radio Alignment Test Setup diagram.

Initial equipment control settings should be as indicated in the following table, and should hold for all alignment procedures except as noted in Table 4.

Table 4 Equipment Initial Control Settings

SERVICE MONITOR

TEST SET

POWER SUPPLY

 

 

 

 

 

 

Monitor Mode: Pwr Mon

Spkr set: A

Voltage: 7.5Vdc

RF Attn: –70

Spkr/load:

DC on/standby:

 

Speaker

Standby

AM, CW, FM: FM

PTT: OFF

Volt Range: 10

 

(center)

 

O'scope Source: Mod

 

Current: 2.5

O'scope Horiz: 10mSec/Div

 

 

O'scope Vert: 2.5kHz/Div

 

 

O'scope Trig: Auto

 

 

Monitor Image: Hi

 

 

Monitor BW: Nar

 

 

Monitor Squelch: mid CW

 

 

Monitor Vol: 1/4 CW

 

 

 

 

 

*When testing TX deviation, where the modulation is greater than 1kHz, set the Service Monitor low pass filter (LPF) to 15kHz.

**The Test Set MT/PL switch controls internal/external audio switching.

Test Mode

RF Test Mode,

NOTE: This note applies to software version R02.09

HT 1000/JT 1000 Radios

and earlier. If the radio is placed in TEST MODE

7

Page 29
Image 29
Motorola HT 1000 service manual General Setup, Test Mode, Equipment Initial Control Settings