Multiquip GAC-9.7HZ manual operation, Before Starting the Engine

Models: GAC-9.7HZ

1 88
Download 88 pages 8.18 Kb
Page 22
Image 22
operation

operation

This section is intended to assist the operator with the initial start-up of the portable generator. It is extremely important that this section be read carefully before attempting to use the generator in the field.

Before Starting the Engine

1.Be sure to disconnect all electrical loads from the generator prior to starting the engine.

2.NEVER start the engine with the main circuit breaker in the ON position.Always place circuit breaker (Figure 11) in the OFF position before starting.

Figure 11. Main Circuit Breaker (OFF)

3.NEVER start the engine with the GFCI or AUX. circuit breakers in the ON position. Always place these circuit breakers (Figure 12) in the OFF position before starting the engine.

Figure 12. GFCI/AUX. Circuit Breakers (OFF)

Starting the Engine

4.Place the choke knob (Figure 13) in the CLOSED position if starting a cold engine.

Figure 13. Choke Knob

5.Place the choke knob (Figure 13) in the OPEN position if starting a warm engine or the temperature is warm.

6.Place the generator's operation switch (Figure 14) in the ON position.

Figure 14. Operation Switch (ON)

7.Press the generator's pushbutton start switch (Figure 15) and listen for the engine to start. If the battery is not installed proceed to step 6.

Figure 15. Start Pushbutton Switch

8.Grasp the starter grip (Figure 16) and slowly pull it out. The resistance becomes the hardest at a certain position, corresponding to the compression point. Pull the starter grip briskly and smoothly for starting.

Figure 16. Starter Grip

Before Starting the Engine NOTICE

DO NOT pull the starter rope all the way to the end.

DO NOT release the starter rope after pulling. Allow it to rewind as soon as possible..

9.If the engine has started, slowly return the choke lever (Figure 13) to the OPEN position. If the engine has not started repeat steps 1 through 8.

10.Before the generator is placed into operation, run the engine for 3-5 minutes. Check for abnormal smells, fuel leaks, and noises that would associate with lose components.

page 22 — GAC9.7HZ 60 hz gENERATOR• operation and parts manual — rev. #2 (03/31/10)