NTP (Network Time Protocol)

70

System Operations (Save Settings)

72

Software Upgrade

73

Logout

74

4. Configuring the Gateway via IVR

75

IVR (Interactive Voice Response)

76

5. Dialing and dialed number routing principle

82

Instruction

82

Dialed Number Processing Flow

82

Appendix A: Glossary

84

Appendix B: Cable Information

90

RJ-45 Network Ports

90

Straight and crossover cable configuration

91

Straight-Through Cabling

91

Cross-Over Cabling

91

Appendix C: Registration and Warranty Information

92

IMPORTANT NOTE

To ensure your Gateway complies with Australian Standards:

1)The protective earthing terminal shall be permanently connected via building wire.

2)The colour of the protective earth conductor insulation shall be green-and-yellow.

3)The protective earthing conductor shall be permanently connected first prior to other connections (eg. telephone cables) and removed last after all other cables have been disconnected.

4)The protective earthing shall not rely on telecommunications network or a cable distribution system.

SmartVoice Gateway(s) User Guide

3

YML832 Rev2

 

Page 3
Image 3
NetComm Gateway Series manual Important Note, To ensure your Gateway complies with Australian Standards