_ STEP I - Front Foot Tube Assembly

a)Remove [2) Carriage Bo_,[2) Washers and

(2)Acorn Nuts from the Front Foot Tube.

b)Position Front Foot Tube [with rollers) in front of Main Fame and align bolt holes, see Figure 1.

¢) Attach Front Foot Tube with (2) Carriage Bolts, (2) Washers and (2) Acorn Nuts that

were removed In Step la.Tighten bolts with Multi Hex Tool provided.

t_'STEP2 - Rear Foot Tube Assembly

a)Remove (2) Carriage Bolts,(2) Washers and

(2)Acorn Nuts from Support Tube.

b)Position Rear Foot Tube (with End Caps] behind Main Fame and align bolt holes, see Figure 2.

e)Affach Rear Foot Tube with (2) Carriage Bolts, (2) Washers and (2) Acorn Nuts that were removed in Step 2a. Hand tighten,

M8 x 65rnm carrlage barfs

main

frame

front foot tube

Figure 1 - Install Front Foot Tube

main frame

support

• tube

M8

nut

nut

 

 

M8 Washer

[//

oct

tube

 

 

 

 

M8 x ,_Smm

enc_cap

 

carriage bolts

 

 

Flgure 2 - Install Rear Foot Tube

Page 7
Image 7
New Balance 5K owner manual Step I Front Foot Tube Assembly, TSTEP2 Rear Foot Tube Assembly