New Buck Corporation 85 installation instructions Final Check

Models: 85

1 39
Download 39 pages 56.5 Kb
Page 22
Image 22
FINAL CHECK

FINAL CHECK

1.Recheck the specified clearances.

2.Remove all foreign material from the firebox area.

3.Open the primary air draft.

NOTE: Plug the power cord into a 115V AC outlet. Set switch to “Manual” and rheostat to “High” position to ensure motor operates properly. Route the cord to prevent damage to the cord insulation from heat and sharp objects. Keep the cord out of the way of traffic to prevent damage caused by tripping, etc.

4.Place crumpled pieces of newspaper in the stove. Light it and close the doors. Ensure that the stove draws properly through the primary draft.

5.Check for smoke leaks around the doors.

If a thorough review of the Troubleshooting Guide in the rear of the manual does not reveal the problem, contact your dealer for assistance.

20

Page 22
Image 22
New Buck Corporation 85 installation instructions Final Check