New Buck Corporation 85 installation instructions B.Wall Exit Into Metal Tee-Box

Models: 85

1 39
Download 39 pages 56.5 Kb
Page 18
Image 18
B.Wall Exit Into Metal Tee-Box

three (3) sheet metal screws or rivets. Next, install an optional New Buck Corporation chimney connector to the flue exit of the heater or you may use “Ell” brackets to fasten the pipe to the stove.

4.Install Single Wall Connector and chimney system per manufacturer’s written operating in- structions. See manufacturer’s list of tested pipes in this manual.

Figure 5

Figure 6

B.Wall Exit Into Metal Tee-Box

1.Mark the plumb line on the wall directly behind the center of the heater. (See Figure 6.)

NOTE: When using #24 ga. minimum blue or black steel pipe maintain 18" between pipe and ceiling.

2.Place the vertical portion of the heater pipe and the elbow in position and project a point onto the plumb line level with the center of the elbow.

3.Measure up so there will be at least 1/4" rise per foot of horizontal connector pipe,

16

Page 18
Image 18
New Buck Corporation 85 installation instructions B.Wall Exit Into Metal Tee-Box